Case 34: Nyingchi Lulang CCCC Project Department 

Project Objective: Demonstrate engineering implementation capabilities for large-scale construction camp integrated HVAC infrastructure.

Building Area: 2,500 m2

Climate Conditions: Nyingchi Lulang high-altitude mountainous climate with cold, damp winters, large diurnal temperature swings, and high staff density.

Project Requirements: Winter space heating for office areas and dormitories, alongside centralized domestic hot water supply for the camp.

Solution & Performance:

Heating System: Configured with 2 units of 60HP ultra-low temperature air source heat pumps using steel radiators as terminals, perfectly matched for prefabricated modular site buildings.

Hot Water System: Configured with a 10HP air source water heater + a 6-ton insulated water tank for camp domestic hot water.

Steel-aluminum radiators heat up rapidly, quickly raising indoor temperatures for offices and dormitories to 18℃–22℃. Hot water supply remains continuous and stable, accommodating peak camp usage. Highly adaptable to prefabricated temporary structures with short installation cycles, high reliability, and simple on-site maintenance.